Hello again guys,
i am trying to figure out how much to raise the outboard which currently is in the first top hole.I took a small video, where in the first "run" i have neutral trim(1/2 in the gauge) and in the second "run" i have 3/4 trim.
https://www.youtube.com/watch?v=hkCACY4dCpI&t=21s
As you can see the AV plate is really buried , and if you look closely you can see the other plate(splash guard??) in the front skimming the water surface..the distance between the two is 5.5 cm.
I am thinking of raising the outboard 2 holes for starters and go from there. Raising just one hole i think would still have the AV plate still buried a lot.
What do you guys think?
i am trying to figure out how much to raise the outboard which currently is in the first top hole.I took a small video, where in the first "run" i have neutral trim(1/2 in the gauge) and in the second "run" i have 3/4 trim.
https://www.youtube.com/watch?v=hkCACY4dCpI&t=21s
As you can see the AV plate is really buried , and if you look closely you can see the other plate(splash guard??) in the front skimming the water surface..the distance between the two is 5.5 cm.
I am thinking of raising the outboard 2 holes for starters and go from there. Raising just one hole i think would still have the AV plate still buried a lot.
What do you guys think?
Comment